Posts

Showing posts with the label construction

6 Months Later, Pt. 2

Image
In the spirit of  comparing how things have changed over the past half year , I thought I'd continue the theme, but this time, with a little trail construction. June 16th: And we've come a pretty long way since then, with the trail going out a good 300m more than before. February 11th: Yes. Quite the change, as the trail is now rounding the promontory made by the bluffs, and we can clearly see the beach of Bluffer's Park, whereas we could only really see the tip before. The story is that the breakwater is to be connected up the the beachfront trail at Bluffer's Park, so that it can form a single multi-use trail. But what if we turn our gaze from westward to northward, and look at the bluffs? Why, we see this! If you don't see it already, there is a small dwelling leaning precariously off the bluff's edge. Here's a closeup: Hello, Mrs. Van! Is Billy home? This Meadowcliffe Drive building has actually been hanging off the bluff's edge on  ...

Update: Trail Construction

Image
I was wrong - the city is actually making pace with construction down by the bluffs. In fact, they currently have finished the  path connecting to Gates Gully.  I'm quite surprised at the speed with which they are progressing every day; after visiting the construction site a few times, they seem to mark progress with posts, which (by my measurements) average 4m of new road each day! At this rate, including all weekends and holidays, the 1.5 km segment remaining between Bluffers Park and Gates Gully should be finished in roughly one year from now. I accessed the trail via the Guild Inn, just as the last of the dump trucks and Toronto and Region Conservation   authorities were packing it in for the day. That's right - from what I can tell, this project seems to be planned from a "parks and rec" as well as "watersheds protection" angle, not so much for cyclo-commuting (insert sad emoticon of your choice here). But, I didn't really expect that it would eve...

Bulldozers and the Bluffs

Image
Last post involved the path down at the base of the bluffs, and how it would make a great bike path (read the dedicated "Commuting, a Trail Proposal"  page). However, construction efforts have been stupendously slow.  Almost no actually progress has been made since two summers ago; dump trucks are only piling up the fill at the one end of the path. The red circle is where the current construction is ongoing.  Upon closer inspection of the site, a bulldozer and an excavator can be seen - these have served only to force the dumped loads into mounds. In the future (who knows how long), the rubble will be pushed into the water to construct the remaining section between Gates Gully and this path situated below the Guild Inn. The red line indicates the path being built now - about 240 meters. This is less than 1/17 of the amount of the path needed to be newly constructed (including breakwater trails), and has taken a full year to get only th...